EPS and EPP Molds for Appliance Structural Parts
Shandong Wanrong Mould & Die makes molds for appliance structural parts, including air-conditioner drain pans and three-piece molds, in EPS and EPP. These parts assemble into the finished machine, so the tooling is built to the OEM drawing rather than as a loose packaging cushion.

Multi-cavity mold plate for appliance drain pans 
Steam-chest mold with vent nozzles across the cavity plate
More photos on the factory gallery.
A structural foam part sits inside the appliance. It has to match mating faces, drain paths and assembly holes. That is a different job from a packaging cushion, and it is why this line is a category of its own.
Work we have photographed includes air-conditioner drain pans and three-piece molds. The same plant supplies packaging molds to the same OEM programmes, so the two can be developed together.
What we tool in this line
Parts we tool
- Air-conditioner drain pans (condensate pans)
- Three-piece molds
- EPS and EPP structural parts for refrigerators, air conditioners and water heaters
How the mold is made here
Aluminium mold bodies are cast in our own foundry, then CNC-machined, assembled and trialled in the same plant. We do not buy in cast blanks.
What we need to quote
- Drawing, 3D file (STEP / IGES / DWG) or a photograph of the finished part
- Shape-moulding machine brand, model and platen size, if you already have a press
- Material to be moulded: EPS, EPP or lost-foam pattern
- Expected annual volume and number of cavities you want
- Destination country, so we can reply in your working hours
Related molds
Home Appliance Packaging Molds
Packaging molds for televisions, air conditioners, refrigerators, washing machines, kitchen appliances and water heaters.
EPP Molds
EPP shape-moulding molds for structural parts and returnable packaging. Different steam, venting and accuracy than EPS.
EPS Molds
Aluminium EPS shape-moulding molds — automatic, semi-automatic and manual — for packaging, boxes, ICF blocks and lost-foam patterns.
Send a drawing. We will come back with a tooling proposal.
A 2D drawing, a 3D file or a photograph of the finished part is enough to start. Name your shape-moulding machine if you already have one. We reply on business days, Monday to Friday, 09:00–18:00 China Standard Time (UTC+8).